Skip to content
Blog

Powering Oakland’s EV Future: EV Charger Installation at City Center West Garage

As a leading EVSE contractor in the Bay Area, we are proud to have recently completed the installation of Kempower DC fast chargers at the City Center West Garage. Located at 1250 Martin Luther King Jr. Way in Oakland, CA, this public EV charging station is part of the Ava Charge network and is a critical investment in Oakland’s clean transportation infrastructure.

Wells Electrical’s Scope of Work

Our licensed electricians handled the entire EV charger installation scope, including:

  • Main service upgrades and conduit routing
  • Installation of distribution equipment and switchgear
  • ADA and city permitting compliance
  • Network configuration in coordination with Ava Charge and Kempower
  • Electrical testing and commissioning

We specialize in turnkey EV charger installs for commercial and multifamily properties, with an emphasis on code compliance, user accessibility, and future expansion.

Why This Project Matters

The City Center West Garage EV charging installation added 31 fast charging connectors in a central downtown location, offering high-power charging options for commuters, city employees, and residents. This site now serves as one of Oakland’s EV charging hubs and aligns with the city’s broader climate and mobility goals.

If you’re a property manager, commercial developer, or city agency looking to install EV chargers, this project is proof of how we can help bring your EV infrastructure vision to life.

Kempower Chargers: Reliable, Scalable and Driver-Friendly

The Ava Charge station uses Kempower DC fast chargers, designed for flexible deployment in multi-vehicle parking environments. As an experienced Kempower charger installer and certified Kempower maintenance contractor, we value these units for their:

  • Dynamic load balancing: Efficient power sharing across charging ports
  • Universal compatibility: CCS1, CHAdeMO, and NACS connector support
  • Compact modular design: Ideal for parking garages, municipal lots, and fleet yards

Whether you’re planning a Level 3 fast charger installation or looking for long-term EV charging infrastructure planning, we have the technical and permitting expertise to guide your project.

Benefits to the Oakland Community

This site is more than just chargers—it’s a milestone in the city’s EV infrastructure development. Adding fast chargers downtown reduces range anxiety and helps meet the rising demand for public EV charging in urban centers.

If you’re an HOA board member, commercial landlord, or developer searching for an EVSE installer in the San Francisco Bay Area, we’re ready to support your next project.

Looking for a Qualified EV Charger Installer?

We install a wide range of Level 2 and Level 3 EV chargers, including:

  • Kempower DC fast chargers
  • Tesla Wall Connectors
  • ChargePoint and FLO commercial EVSE
  • Utility-connected systems with PG&E, CPAU, and other public agencies

Let’s talk about how we can help you meet EV charging grant requirements, design load-managed systems, and future-proof your site.

Contact Us for EV Charger Installation in Oakland and the Bay Area

We serve clients from San Jose to Sacramento to Napa — providing trusted electrical solutions for modern energy systems. Whether it’s a few chargers or a full-scale EV infrastructure deployment, we’re here to help.

Call our emergency Electricians for 24/7 electrical repairs for your home or business in San Francisco, CA.
(415) 255-7831